7th Day - Ruins in the basement
Behind us is another day of pounding. I hope that this is slowly coming to an end - at least for this week. Workers have prepared all that tomorrow starts the installation of new plumbing and central heating razvoda. Furthermore an all (at least on the ground floor, the floor is still waiting for us) to replace the main vertical pipes. To this end, protect boiler in the basement. I do not know how much protection is helping - this afternoon, the boiler completely dusty in the corner next to the large vertical pile of rubble.
If you are wondering where man away things when workers break, you will probably soon become clear in the next picture. I wonder just where things will be put away when we renovated the basement.
Tuesday, September 29, 2009
Monday, September 28, 2009
Digital Playground Coupon
6th day - a new week, new workers
Monday. Contractors last week completed its work, now is the kinds of plumbing and a new distribution pipes for central lines. The day passed mostly in breaking the walls which will be moved vertical central pipe fittings. Especially interesting will be held on Thursday and Friday, when We will exchange the main sewage pipe vertically in the ground floor and first floor.
addition intolerable noise whole day we had a minor flood. Nothing terrible - but enough to go before going to sleep again to check if everything is OK.
Monday. Contractors last week completed its work, now is the kinds of plumbing and a new distribution pipes for central lines. The day passed mostly in breaking the walls which will be moved vertical central pipe fittings. Especially interesting will be held on Thursday and Friday, when We will exchange the main sewage pipe vertically in the ground floor and first floor.
addition intolerable noise whole day we had a minor flood. Nothing terrible - but enough to go before going to sleep again to check if everything is OK.
Friday, September 25, 2009
Are Snake Bites Or Angel Bites A Sin?
5th day - they went
Today was more of a quiet day - builders was harvested and odpeljaljali rubble that is left, they built kopalnično wall, and, perhaps most importantly, supported by the plates. So we have now in the basement right slalomišče. Having financial difficulties Slovenian skiers can come to us at least on dry training.
more than follow the well-intended plan. After a week of breaking it is all ready for next week to start working on the plumbing and central installation. In particular, the cheerful when we will exchange the main vertical sewage pipe. We therefore have a whole weekend to gather new strength for next week's pounding, dust, shock, ...
Well, the weekend we have more or less already filled by selecting the bathroom ;-) You need flooring, in addition, Arne basketball game in Laško ... therefore, do not get bored. But since we have quite obviously too much free time, we find even in Beltinci something that we see you on Sunday. HOV.
Today was more of a quiet day - builders was harvested and odpeljaljali rubble that is left, they built kopalnično wall, and, perhaps most importantly, supported by the plates. So we have now in the basement right slalomišče. Having financial difficulties Slovenian skiers can come to us at least on dry training.
more than follow the well-intended plan. After a week of breaking it is all ready for next week to start working on the plumbing and central installation. In particular, the cheerful when we will exchange the main vertical sewage pipe. We therefore have a whole weekend to gather new strength for next week's pounding, dust, shock, ...
Well, the weekend we have more or less already filled by selecting the bathroom ;-) You need flooring, in addition, Arne basketball game in Laško ... therefore, do not get bored. But since we have quite obviously too much free time, we find even in Beltinci something that we see you on Sunday. HOV.
Thursday, September 24, 2009
Emmanuel Carrere Eduard Limonov
4th day - the plate, but not LP
When you know you're near the end of reconstruction or. construction. When the day goes by without surprises. Also, some we did not close it. Today we also found that the plate on the ground floor, at least in one room sagged and cracked. Not as bad as it sounds. However, the matter will be adequately supported, armirali floor, in the end plate further supported when we rehabilitate our basement. This is at least the current work plan.
Two days ago I was terribly optimistic about the bathroom. Well it turned out to be incredibly difficult to satisfy certain desires. I admire architects who are capable of - Probably because such an architect would not have chosen. Spela does not fall into that category ;-) So what are we going to the bathroom. Narada will shortly after his own - but the concept proposed by the architect. I know otherwise, it will not be for the magazine, but still - after 30 + years, we will again ...
When you know you're near the end of reconstruction or. construction. When the day goes by without surprises. Also, some we did not close it. Today we also found that the plate on the ground floor, at least in one room sagged and cracked. Not as bad as it sounds. However, the matter will be adequately supported, armirali floor, in the end plate further supported when we rehabilitate our basement. This is at least the current work plan.
Two days ago I was terribly optimistic about the bathroom. Well it turned out to be incredibly difficult to satisfy certain desires. I admire architects who are capable of - Probably because such an architect would not have chosen. Spela does not fall into that category ;-) So what are we going to the bathroom. Narada will shortly after his own - but the concept proposed by the architect. I know otherwise, it will not be for the magazine, but still - after 30 + years, we will again ...
Wednesday, September 23, 2009
Custom My Own Bmx Bike
3rd Day - Again, we have cold water
great. We have cold water running from faucets. Thanks Ales great master, which is a correction. Maybe someone said it would have to be able to correct himself - but it really does not work. I will, once they have valves, water faucets, and more, your IP address. Perhaps this is not all that bad idea. With all inflating the concept of Internet of Things (IOT - as that would not already have enough acronyms), is an idea worthy of the EU project. But sensors are not enough. Super would be if I could ssh-jal on tap in the bathroom and perform any rm-rf * thereby removing rust and stone from the mantle. But should be enough fantasizing (obviously knows that it is currently at work preparing a project proposal to the EU).
Yesterday I mentioned a bunch of construction waste. Waste is now loaded and taken to a landfill. But what if he / she has inherited a pile of wood waste (see picture). Especially in case of renewal is well known that the waste (debris, wood, etc..) Strictly separated. Price unsorted waste is approx. 60 EUR / t. This may sound like very little, but did not. Tono dopadkov grow very very quickly - knocking down a partition stenco, however.
After a lengthy selection we have today ordered the window (for the ground floor and first floor). Joinery Manufacturer Šemrl , wood (pine - white), outside clad in aluminum (RAL 7016). Windows are great, price is so so. Suppose that we have today purchased a Renault Modus with a discount ;-)
Not to forget, one more question. Who knows what the greatest charm of the old house renovation / apartments? ( long reflection ) The answer is more than obvious. For the third (3) the day you come across something you did not previously anticipated. In our case (the house was built in 1933) so we will exchange the full pressure of the ground floor. OK. We will arrange for the next 100 years. If only the banks for loans to take account of something.
Today, for the end of something different. Photo by after dinner did son. We can see that it was named after one of the most famous Slovenian photographers ;-) I think it's something special. Too bad that the picture date.
great. We have cold water running from faucets. Thanks Ales great master, which is a correction. Maybe someone said it would have to be able to correct himself - but it really does not work. I will, once they have valves, water faucets, and more, your IP address. Perhaps this is not all that bad idea. With all inflating the concept of Internet of Things (IOT - as that would not already have enough acronyms), is an idea worthy of the EU project. But sensors are not enough. Super would be if I could ssh-jal on tap in the bathroom and perform any rm-rf * thereby removing rust and stone from the mantle. But should be enough fantasizing (obviously knows that it is currently at work preparing a project proposal to the EU).
Yesterday I mentioned a bunch of construction waste. Waste is now loaded and taken to a landfill. But what if he / she has inherited a pile of wood waste (see picture). Especially in case of renewal is well known that the waste (debris, wood, etc..) Strictly separated. Price unsorted waste is approx. 60 EUR / t. This may sound like very little, but did not. Tono dopadkov grow very very quickly - knocking down a partition stenco, however.
After a lengthy selection we have today ordered the window (for the ground floor and first floor). Joinery Manufacturer Šemrl , wood (pine - white), outside clad in aluminum (RAL 7016). Windows are great, price is so so. Suppose that we have today purchased a Renault Modus with a discount ;-)
Not to forget, one more question. Who knows what the greatest charm of the old house renovation / apartments? ( long reflection ) The answer is more than obvious. For the third (3) the day you come across something you did not previously anticipated. In our case (the house was built in 1933) so we will exchange the full pressure of the ground floor. OK. We will arrange for the next 100 years. If only the banks for loans to take account of something.
Today, for the end of something different. Photo by after dinner did son. We can see that it was named after one of the most famous Slovenian photographers ;-) I think it's something special. Too bad that the picture date.
Tuesday, September 22, 2009
Things Ato Write In A Wedding Card
second day - is a growing pile of
light of all this renovation is running without major problems - if, of course, ignore the noise, dust, ... and of course the fact that we are in the house virtually no cold water. Why? I have no idea. I have dust, but in practice it looks something like this ( picture does not show the actual S (t ):
light of all this renovation is running without major problems - if, of course, ignore the noise, dust, ... and of course the fact that we are in the house virtually no cold water. Why? I have no idea. I have dust, but in practice it looks something like this ( picture does not show the actual S (t ):
Well, we have to be a reliable way to choose a bathroom. The floor plan is already largely agreed on how to ceramic tile, we will know by the end of the week, sanitary ceramics is also OK, tap, too. Even the biggest problem remains as to where to place hooks for towels. At all other world problems to this latest sounds like the most banal problem under the sun. The information for future generations, in the event that I would spend a calf records: this is not really ;-) No, enough for today. Workers arrive at 7:00. To conclude, this time painting the bathroom in the work.
Monday, September 21, 2009
Typical Ambulance Ride Cost
first day - started We
We started with the renovation of the house. All this will take some time - probably by summer 2010. While this sounds like that will house the newly built, but to any nearby readers quickly calm - renovation will take place after several phases and will therefore also lasted so long. To get started, we have embarked on the ground floor or. High ground floor, if I'm more accurate. For today only two pictures bathroom before and after the demolition of partition walls.
We started with the renovation of the house. All this will take some time - probably by summer 2010. While this sounds like that will house the newly built, but to any nearby readers quickly calm - renovation will take place after several phases and will therefore also lasted so long. To get started, we have embarked on the ground floor or. High ground floor, if I'm more accurate. For today only two pictures bathroom before and after the demolition of partition walls.