How To Draw A Rabbit Hutch

11. week - Replacing windows

The week started with the idea of \u200b\u200bchange-ups - in my opinion, finally. Old - a double - were needed change for several years.

If anyone thinks that the window replacement fast, clean and without major problems is very wrong. We are taking the matter quite seriously, and remove anything that is easily removed, covered everything and especially hope for the best ;-)


On Wednesday morning has begun - first on the second floor . Very soon it was clear that the case will not run as easily and quickly than we imagined. Openings for windows (external reveals) were a little too small - enough that it was necessary to refer the matter further collapsing. The consequences are obviously clear. A lot more work for all.

how the matter looked like the work shown in the following set of images.


By comparison, an example of room "before" and " under the "trade-ups. New windows were put entirely on the current edge of the facade. Interior reveals both now quite broad - the outside is a new facade with 16-20 cm of insulation is practically nonexistent.


mere window replacement was completed in one day. After that, it has only just begun :-) It was also necessary: \u200b\u200b
  • zabetonirati lower shelves,
  • with gypsum boards made of internal reveals and close the space above the windows (old window frame was in place for installation of internal blinds)
  • and of course clean.

If all this happens when someone asks whether it is possible that a family of four while living in the apartment. Even accidentally Sun So we moved in the upper floor of the house and there bivakirali week.



Finally, only "commercial" for a manufacturer of windows installed. We are very pleased with them - the windows of course.


Sunday, November 29, 2009

Why Do Older People Do Cosmetic Surgery

10th

Earlier this week we were still in the removal of old layers berve ...
... on the weekends, have already shown the first signs of a new image. It is interesting how such small things mean a lot. In particular, this turns all the concerns demolition and removal to a new setting.

Sunday, November 22, 2009

Akiba Online Probleme

45.dan week - after 9-week

work in the house is slowly continuing. The bathroom was down the plaster ceiling panels. So far, of course, still looks pretty raw but still everything is slowly getting their final shape.

Otherwise, now in the house painters, who are struggling with the disposal of countless layers of paint off the walls and ceilings. Pretty exhausting, time consuming and, ultimately, dirty work.


Well, news week, surely the fact that we FINALLY ordered the bathroom: ceramic tiles, sanitary ceramics, desk, lockers, showers doors, etc.. Everything.

Friday, November 13, 2009

Where Can You Buy Yucky Duck Diapers

40th percentile day - at the end of 8-week

This week we learned when to be doavljena window. Since little or. lot behind the log reconstruction can tell you that we started to panic unnecessarily. Window come Village in early December and not during the week of 23-27.11.2009.

So before changing windows, it was necessary to remove the foreign policy and the somewhat extended external reveals. Both are clearly evident in the fol two images.

Monday, November 9, 2009

Maxine Jokes For Birthdays

35th percentile day - the end of the seventh week

We had a fairly quiet week. Complete the masonry work: fine plastering walls, sealing the walls in the bathroom, toilet and bidet linings.

more or less then the continuation of the window and wait for the appropriate dry screeds. The windows are to be built in early December, screed should be dry around about mid-December. Until then, we still have much work. Given all the bathrooms are choosing the hard part, though I definitely weeks ago wrote that everything in connection with a bathroom agreed harmonization. Obviously I was wrong - unfortunately.

Finally, this time with a new picture of the bathroom wall - Bathroom now looks already much better than a few weeks ago.

Friday, October 30, 2009

Premium Payment With 820 5010

29th and 30 Day - National holidays

finally :-) We take a breather from the constant rumble. At times it was boring. Yes. Proceed on Monday - after holidays.

Wednesday, October 28, 2009

Homemade Pellet Trap -silent

28th Day - 25th Floor

Well, after almost 6 weeks renovation of the ground floor is reached on the type of production or pressure. slab. The issues we deal with somewhat more cautious and we armirali floor and anchor the existing load-bearing walls. The pressures are so designed as a floating floor, ie, Styrofoam 6 cm + 6 cm screed.

video shows a performance floor, which took place without major problems - except that shortly before the end ran out of sand and it all has been delayed for over an hour. Interestingly, it was well after the workers have already left and it was necessary to clean up after them.


Friday, October 23, 2009

Can You Tow With A Ford Escape 2005

Day - At the fifth week


Thursday, October 22, 2009

Pleurisy- What To Do To Feel Better

24.dan - Drilling

day passed quite peacefully. Sat ometavali Building walls and preparing "ground" for electricians who need to connect pipes on the floor of the electrical installation.

What was really interesting to see daner was drilling holes in outside walls, which have a thickness of 45 cm. All together it was pretty painless (read fast and clean). For information to all who would take something like that but the price for a 1 cm hole, approx. 2 EUR. In the end, which accumulates.

Sunday, October 18, 2009

Loaded Wiki Longboard

17th - 20 Day - End of fourth week

passed a few days since the last publication. Changes? Week was really izponjen of events - some are for publication on the blog, but some (still) do not.

electricians, after a short break on Monday came again on Wednesday morning. When I say morning, I think a more middle of the night - at 6:00! Are we not complain, but ... Otherwise, with no problems ever - in three days, make the necessary preparations for the continuation of building work. Thus, early next week again came builders (thankfully starting to "only" at 7:00). With a little luck will be on the weekends also constructed pavements. We'll see! For

Today, only a picture of the current situation.

Tuesday, October 13, 2009

Red Cervical Mucus One Week Before My Period

16th day - stands

Progress on reconstruction was now minimal. At 6:30 electricians have experienced - unfortunately it was very quickly apparent that today only (a bit) to indicate the location where the el. installations: sockets, switches, lights, connections for TV, etc.. We very quickly concluded in this regard. Then they work on another site, I do the job. Apparently they come in on Wednesday morning a "serious" do not just tagging on the walls ;-)

Yes, you will not a day goes by that something does not govern in relation to the installation. Even today it did. Necessary is to connect it to the new intake pipes in the basement. If everything is on schedule, the tomorrow include central furnace.

It is, however event of the day occurred around 20:10. E. decided that the world view from the other dimensions. Congratulations! Damage to the A. missed a great event - a camp.

How To Turn On Pokemon Snap Sixty Force

14th and 15 day - pulling, pulling, ...

title could also be identical to the previous - "nothing special". Excitement over the course of the work is slowly but surely withdrawing Recognizing that now really been able to finalize the water. Well, unfortunately, are still little things which are subject to the Central lines.

On Thursday (14th day) we had fun in the house. Fortunately it was not bad, but the case dragged on until 19:00.

Wednesday, October 7, 2009

Luggage Outlets Mississauga

11, 12 and 13 day - nothing special

As indicated by its title, in recent days did not happen much. Or is it only seems so because we had today, Wednesday, a day off. In translation, this means that the house was not workers - also a nice change. I just hope there was not a calm before the storm, as the electricians come Friday.

Further, in case of ground water has been completed. On Monday and Tuesday were placed in tubes for central, so everything looks all right decent. Tomorrow is necessary, unfortunately prevezati central passage in the floor - thus with us in the house. After securing a plumber, there is no more breaking - but you never know. Preparing for the worst ;-)

Friday, October 2, 2009

How Long Does Plan B Stay In You?

10th day - the end of the second week


Thursday, October 1, 2009

Emerald Pokemon Cydia Cheats

8th and 9 Day - Home Alone

lot has changed in the last two days. We have prepared an application for the ECO Fund (end F - Replacement of windows), some are moving on even zamljišča (we'll see how it will work out), M. and E. not at home, A. Nor, ... and started the academic year 2009/10. Oh, how this great sounds. It seems to me that we have recently, in fear expecting what will happen during the transition to the year 2000.

regarding the progress of the renovation work could wrote that under the plan: water supply in the ground floor is replaced and the main sewer pipe vertical well prepared for the central installation, ... Only an electrician is calling me every other day with a message that can not yet begin to work. Nevermind, we still have to choose the light, fixed site outlets, etc.. - There are quite a lot of us left for the weekend. The mandatory photo of one of the most beautiful rooms.


How do you know that the workers had entertainment in the house? When you realize that you have a bathroom in the hallway. Funny - or not, because it probably means that the "real" bathroom very badly.

Tuesday, September 29, 2009

Better Business Reports On Mdvip

7th Day - Ruins in the basement

Behind us is another day of pounding. I hope that this is slowly coming to an end - at least for this week. Workers have prepared all that tomorrow starts the installation of new plumbing and central heating razvoda. Furthermore an all (at least on the ground floor, the floor is still waiting for us) to replace the main vertical pipes. To this end, protect boiler in the basement. I do not know how much protection is helping - this afternoon, the boiler completely dusty in the corner next to the large vertical pile of rubble.


If you are wondering where man away things when workers break, you will probably soon become clear in the next picture. I wonder just where things will be put away when we renovated the basement.

Monday, September 28, 2009

Digital Playground Coupon

6th day - a new week, new workers

Monday. Contractors last week completed its work, now is the kinds of plumbing and a new distribution pipes for central lines. The day passed mostly in breaking the walls which will be moved vertical central pipe fittings. Especially interesting will be held on Thursday and Friday, when We will exchange the main sewage pipe vertically in the ground floor and first floor.

addition intolerable noise whole day we had a minor flood. Nothing terrible - but enough to go before going to sleep again to check if everything is OK.

Friday, September 25, 2009

Are Snake Bites Or Angel Bites A Sin?

5th day - they went

Today was more of a quiet day - builders was harvested and odpeljaljali rubble that is left, they built kopalnično wall, and, perhaps most importantly, supported by the plates. So we have now in the basement right slalomišče. Having financial difficulties Slovenian skiers can come to us at least on dry training.


more than follow the well-intended plan. After a week of breaking it is all ready for next week to start working on the plumbing and central installation. In particular, the cheerful when we will exchange the main vertical sewage pipe. We therefore have a whole weekend to gather new strength for next week's pounding, dust, shock, ...

Well, the weekend we have more or less already filled by selecting the bathroom ;-) You need flooring, in addition, Arne basketball game in Laško ... therefore, do not get bored. But since we have quite obviously too much free time, we find even in Beltinci something that we see you on Sunday. HOV.