Well, after almost 6 weeks renovation of the ground floor is reached on the type of production or pressure. slab. The issues we deal with somewhat more cautious and we armirali floor and anchor the existing load-bearing walls. The pressures are so designed as a floating floor, ie, Styrofoam 6 cm + 6 cm screed.
video shows a performance floor, which took place without major problems - except that shortly before the end ran out of sand and it all has been delayed for over an hour. Interestingly, it was well after the workers have already left and it was necessary to clean up after them.