Friday, October 30, 2009

Premium Payment With 820 5010

29th and 30 Day - National holidays

finally :-) We take a breather from the constant rumble. At times it was boring. Yes. Proceed on Monday - after holidays.

Wednesday, October 28, 2009

Homemade Pellet Trap -silent

28th Day - 25th Floor

Well, after almost 6 weeks renovation of the ground floor is reached on the type of production or pressure. slab. The issues we deal with somewhat more cautious and we armirali floor and anchor the existing load-bearing walls. The pressures are so designed as a floating floor, ie, Styrofoam 6 cm + 6 cm screed.

video shows a performance floor, which took place without major problems - except that shortly before the end ran out of sand and it all has been delayed for over an hour. Interestingly, it was well after the workers have already left and it was necessary to clean up after them.


Friday, October 23, 2009

Can You Tow With A Ford Escape 2005

Day - At the fifth week


Thursday, October 22, 2009

Pleurisy- What To Do To Feel Better

24.dan - Drilling

day passed quite peacefully. Sat ometavali Building walls and preparing "ground" for electricians who need to connect pipes on the floor of the electrical installation.

What was really interesting to see daner was drilling holes in outside walls, which have a thickness of 45 cm. All together it was pretty painless (read fast and clean). For information to all who would take something like that but the price for a 1 cm hole, approx. 2 EUR. In the end, which accumulates.

Sunday, October 18, 2009

Loaded Wiki Longboard

17th - 20 Day - End of fourth week

passed a few days since the last publication. Changes? Week was really izponjen of events - some are for publication on the blog, but some (still) do not.

electricians, after a short break on Monday came again on Wednesday morning. When I say morning, I think a more middle of the night - at 6:00! Are we not complain, but ... Otherwise, with no problems ever - in three days, make the necessary preparations for the continuation of building work. Thus, early next week again came builders (thankfully starting to "only" at 7:00). With a little luck will be on the weekends also constructed pavements. We'll see! For

Today, only a picture of the current situation.

Tuesday, October 13, 2009

Red Cervical Mucus One Week Before My Period

16th day - stands

Progress on reconstruction was now minimal. At 6:30 electricians have experienced - unfortunately it was very quickly apparent that today only (a bit) to indicate the location where the el. installations: sockets, switches, lights, connections for TV, etc.. We very quickly concluded in this regard. Then they work on another site, I do the job. Apparently they come in on Wednesday morning a "serious" do not just tagging on the walls ;-)

Yes, you will not a day goes by that something does not govern in relation to the installation. Even today it did. Necessary is to connect it to the new intake pipes in the basement. If everything is on schedule, the tomorrow include central furnace.

It is, however event of the day occurred around 20:10. E. decided that the world view from the other dimensions. Congratulations! Damage to the A. missed a great event - a camp.

How To Turn On Pokemon Snap Sixty Force

14th and 15 day - pulling, pulling, ...

title could also be identical to the previous - "nothing special". Excitement over the course of the work is slowly but surely withdrawing Recognizing that now really been able to finalize the water. Well, unfortunately, are still little things which are subject to the Central lines.

On Thursday (14th day) we had fun in the house. Fortunately it was not bad, but the case dragged on until 19:00.

Wednesday, October 7, 2009

Luggage Outlets Mississauga

11, 12 and 13 day - nothing special

As indicated by its title, in recent days did not happen much. Or is it only seems so because we had today, Wednesday, a day off. In translation, this means that the house was not workers - also a nice change. I just hope there was not a calm before the storm, as the electricians come Friday.

Further, in case of ground water has been completed. On Monday and Tuesday were placed in tubes for central, so everything looks all right decent. Tomorrow is necessary, unfortunately prevezati central passage in the floor - thus with us in the house. After securing a plumber, there is no more breaking - but you never know. Preparing for the worst ;-)

Friday, October 2, 2009

How Long Does Plan B Stay In You?

10th day - the end of the second week


Thursday, October 1, 2009

Emerald Pokemon Cydia Cheats

8th and 9 Day - Home Alone

lot has changed in the last two days. We have prepared an application for the ECO Fund (end F - Replacement of windows), some are moving on even zamljišča (we'll see how it will work out), M. and E. not at home, A. Nor, ... and started the academic year 2009/10. Oh, how this great sounds. It seems to me that we have recently, in fear expecting what will happen during the transition to the year 2000.

regarding the progress of the renovation work could wrote that under the plan: water supply in the ground floor is replaced and the main sewer pipe vertical well prepared for the central installation, ... Only an electrician is calling me every other day with a message that can not yet begin to work. Nevermind, we still have to choose the light, fixed site outlets, etc.. - There are quite a lot of us left for the weekend. The mandatory photo of one of the most beautiful rooms.


How do you know that the workers had entertainment in the house? When you realize that you have a bathroom in the hallway. Funny - or not, because it probably means that the "real" bathroom very badly.